Sunday, November 29, 2009

The plans and the price

We had our meeting to discuss the plans and the price on Friday. Overall, the meeting was good. Mr. Architect gave us the price of the house "turn-key ready." That's not really what we are going for, because we know people who can do work for us at a cheaper rate, plus, we know we can get materials cheaper than he calculated. Somehow, the house has turned into his Luxury Line, so the materials he included in the price include hardwood flooring, stone tile, and a whole bunch of expensive things. There are things that we definately don't need, like a towel warmer in the bathroom (I know, they may be nice, but it just isn't important for me.)
Overall, the price was really okay. A little high for Joern's desires, but somewhere within our budget- and not at the high end. We will definately work on that a bit, but we left pretty satisfied.
Oh, and in case you were interested, here are the plans for the house:
Cellar

I know it may look a little weird that the garage is not parallel to the house, but if it is parallel to the house, we would never be able to get in and out of our garage properly. It won't look bad because the majority of the cellar is underground, and the only thing you'll be able to see is the entryway and the garage. Going through the foyer, on the right will be a utility room/ bathroom, cellar, and the room for the heater and electrical system (Technik) on the left will be a very large room that may stay one large room for movies and future playroom, or we may divide it. The stairs go up from the back of the house (so yes, you have to walk all the way around the stairs to go up, but there is a reason for that.)
First Floor

We still have a few changes to make in the floor plan, and are thinking of adding a meter to the dining room, but you'll come up the stairs into the great room. On the left will be the living room, dining room to the right, with a fireplace acting as a room divider. On the right hand side of the stairway will be the kitchen, with a very large island- hooray! Vor. stands for "Vorratsraum," and will be the pantry. The back door is opposite the staircase heading upstairs. The bathroom is to the left of the staircase. Yes, I know it is a little dumb that you have to walk all around the house to get to the bathroom, but we can't really find another solution. To the left of the staircase also is the office / guest room.
Upstairs

At the top of the stairs, the master bedroom, walk-in-closet, and master bath run along the left-side of the house. The bathroom is HUGE, and we have planned a large walk-in shower. Straight in front of the staircase is the children's bathroom. I am hoping we can work the washer and dryer into this bathroom, maybe taking some room from the adjacent bedroom, which would allow us to hide the washer and dryer behind bifold doors. The two bedrooms will also have possibly a balcony.
I am generally pleased with the plans. They need a little work, this isn't the final, but a good idea of what our home will look like.
Oh yeah,and there are mostly all floor height windows. There is a great view from the top floor, and these windows will help us to maximize the view.

Wednesday, November 25, 2009

Boo Hoo

We were supposed to meet with Mr. Wurth today to discuss the price of the house. We requested two prices- one with the house being 32 feet wide, and the other with the house being 36 feet long. I am so hoping that the second option is doable- it really would make the house big and beautiful!
Sadly, he was too busy today, and we had to put off the meeting until Friday. Although I am nervous about the prices, I just want to know so that we can move on with the planning. Grrr!!

Tuesday, November 17, 2009

Another meeting

We met with Mr. Architect again tonight. Sadly, we were hoping for a bit more. Joern emailed our house design last week, and we were hoping that he had taken our design and gone over it architecturally. But, he said that he hadn't received Joern's email. So, we printed the plans out quickly, and just quickly talked about the plans.
Our garage needed to be a bit wider, but since we have a larger property now, we can definately make a garage wide enough for both of our vehicles. He also pointed out that we should move our entry door a bit, and suggested a wider entry hall. All good points.
The surveyor came out last week, and did a 3D measurement of the property. Completing this allows for the architect and the town to have an exact understanding of what the house will look like, as well as drawing up specific property lines.
We haven't planned a new meeting yet, but once Mr. Architect draws up new plans with our design, we'll meet again. He's also working on the official building application process. I'm so interested to see where this goes!

Saturday, November 14, 2009

Familie & Heim Fair

This afternoon, we headed out to the Stuttgart Messe (Trade Fair Hall,) for the Family and Home Fair. Unfortunately, this is about as close to a fair for building around here. I recently saw an ad for a building fair in Bern, Switzerland that looked incredible, sadly, for us, the fair wasn't so big.
Since the fair was family and home, it was not only house related, nor building related. But, there were some very interesting things. We picked up some brochures on hot tubs, which is us just dreaming. We spoke with a representative from a company that produces fireplaces. It was so interesting! I learned how German fireplaces work- the chimney is lined with very dense bricks that heat up from the fire. If you have a good quality fireplace here, and you light a fire for a little while at night, the bricks retain the heat until the following morning! That's gotta save on heating costs. They had a model, similar to the one below, which is quite similar to our "dream" fireplace.

Then we found a kitchen seller. It was so interesting!! This company has remarkable prices compared with furniture stores here. Their prices are so low because they do not advertise in newspapers or on television. We were given a quote that included granite countertops, and it was really affordable. I have a feeling that this store's prices are pretty much unbeatable.
Overall, I am pretty glad that we went to the fair, although it could have been a little better. It was a fun, and exciting day!

Saturday, November 7, 2009

Our first official meeting

We met with our designer/ architect on Friday after I got out of work. It was our first official meeting with Mr. Architect as our project manager. The meeting was quite informative, and a bit of drain already on the wallet. He started out with formally giving us the plans he drew up for our house. Unfortunately, we will not be going with his design, as we are limited by the town as to which direction we can build our house, and Mr. Architect's design was not in the proper direction. No worries though, it is fixable!
But, we paid the first 1/2 of the charge for Mr. Architect to complete a "Baugesuch" or building application for the town of Neckartaifingen. Oy, they're gigantic! The application must include a pretty accurate house plan, as well as tons of other information. We won't actually purchase the lot if this application does not get approved, but there is little chance after our meeting on Wednesday that the application will be denied.
We haven't officially signed with Mr. Architect, this will only happen after the application is approved and Mr. Architect gives us a final offer on the home we want. Although this is a little stinky after we invest some money, it also gives a safety cushion in case his actual offer comes out more expensive than another housing company.
Mr. Architect gave us our first homework assignment as well, to put together our dream design and a "wish list" by Tuesday, so that he can include these items in the application.
Good thing we're headed to Cologne tomorrow to pick up my new car, we have two hours on the train to work on the "wish list."
See you tomrrow with an update!

Thursday, November 5, 2009

BIG NEWS!!!

I mentioned the piece of land that we were looking into a in a few earlier posts. We were waiting to hear back from the town selectman on permission to build on a lot between my in-laws' house and a few new planned duplexes.
The piece of land is actually perfect, because it is kind-of useless for anyone but us. All this piece of land would do is drive up the price of land for someone wanting to build there. In today's market, and given the price of land here, a large yard isn't always a plus for someone wanting to build their half of a duplex.
So, the owners of the land offered to sell us this little chunk. It would not be usable, except that my in-laws have offered to give us some of their land, which abuts this mini-lot. We can't purchase it quite yet, but the largest hurdle was getting the town to approve our plan.
My father-in-law took our idea to the selectman of the town. Surprisingly, he then took our idea to the county building department. This saved us a bunch of time, because even if our town approved this plan, it still would need to go to the county building department. Since there is no official mandate for the type of houses to be built on these open lots, this process can take months. Lucky for us, the process took about a month.
Yesterday, we had our appointment with the selectman. And, well, we've been approved to build on the lot!!!!!!!!!!!!!
We have an appointment to meet tomorrow with our house designer/ architect after work. We're pretty certain that we'll go with him, because he can help us optimize the house for the piece of land on which we'll be building. We need to pay him for his plans tomorrow. Plus, he will then take our house plan to the town council for approval. The selectman told us that he doesn't foresee much of a problem with approval of the plans- even for two full floors. A flat roof was even approved! Not that I want a flat roof, of course, it was just our original plan. Once our plan is approved, we can officially purchase the lot. Unless a minor miracle occurs, we won't be able to begin building until March. It gets too cold here, and the ground freezes, which makes installing a garage rather difficult.
BUT, the good news is we have a definite start. AND, we are beginning to get a time-line in place.
I can't believe how exciting this all is. It isn't just a dream anymore, we're so close to our dream home!!
So, the ball has finally started rolling! As of tomorrow afternoon, we'll have the first official set of house plans.

Sunday, November 1, 2009

3 more sleeps!

We will know on Wednesday if we'll be able to build on the property near my in-law's house or if we'll have to purchase a full building lot!
3 more sleeps!! I hope that I'll be able to sleep for the next three nights with this building anticipation!!