Friday, May 28, 2010

Our architect meeting

Well, I first posted about our meeting with the architect and structural engineer in narrative form. It is really long and dry. I've decided to redo the post as a list, to make it quicker and easier. So, here goes.
We met with Joern's cousin, Stephan the structural engineer, and Herr B, our architect on Thursday afternoon. Herr B is now finished with the first set of blueprints, as is Stephan finished with the structural analysis. The meeting was to pull things together.
We moved floor by floor discussing the house. The major discussions focused on the placement of the insulation for the concrete slab, and correcting the uneven planned roof on Joern's garage.
Foundation and cellar:
- choices for insulation for the concrete slab were either underneath the slab and on top, or simply all on top. There are benefits to both, but in the end, we needed to go with insulating on top of the slab. We could not insulate underneath the slab, because there needs to be some elasticity in this procedure, and since we are building on a hill, elasticity is not so ideal.
- the 2 car garage (or Joern's garage,) had a roof that was two different heights. Because German law requires in our situation, that we have a green roof on part of both garages, as we are building our garages directly on the border with our neighbors. There are different types of green roofs, and evidently, the first, and not-so-great, architect planned 25 cm. of grass on the green portion. 25 cm of dirt allows grass to grow, and we would be required then to mow the roof of our garage! Bleh! We chose instead to have a more self-sustaining, less labor intensive roof covering. Plus, this allows for the roof to be evened out, and to Joern's pleasure, to have the height of the ceiling in the garage increased. This is most exciting to Joern who dreams of having a car lift in his garage.
- garages will not be insulated.
- the concrete slab will need to be reinforced against the pressures of the hill.
- the house will be built with Ytong blocks. Ytong's many advantages include ease of use, good insulating properties, sound absorption, and protection against fire. It is a well-used building block here.
- the entry foyer in the cellar continues as a discussion for Joern and myself. The architect suggested a large skylight dome be placed on the front terrace of our house. Doing this would bring tons of natural light into our foyer, as well as prevent us from using this terrace. We're not sure what to do here.
First floor
-we moved the door of the office over a bit. As was planned origianlly, you would have to trip over the sectional to access the office. Glad we moved it!
- electric Rolladen. German houses most often have Rolladen, which are metal roller shutters, simialar to security blinds. Joern likes them because they completely black-out a room, which will be a help when we try to put our kids to bed and the sun is still shining brightly! They are also quite effective against the sun in the summer. Last, I like that the electric ones provide an additional measure of security, as the rolling mechanism in electric Rollanden locks. I am already a little nervous about staying in this big house all by myself if Joern has to travel. Anything to increase the security helps!
- the electric Rolladen will be partially on a central control. I didn't want to control all, because the view from the upstairs bedrooms at night is beautiful, so I don't necessarily want to close all the shutters at once.
- interior doors will be extra high. Normal interior doors here are about 6.5 feet, but we chose doors that are close to 7 ft. high.
- we gave Mr. B the blueprints for the kitchen, which were completed by the kitchen studio. He will work these in to the official blueprints.
Second floor
- Mr. B suggested we visit a bath showroom to select fixtures that we like. This is called "bemusterung." Building companies here have a "Bemusterungscenter," where you go to chose from their options. We love that our "Bemusterungscenter," is every store in Germany, and even outside Germany if we choose!
-Mr. B feels like the children's bathroom is laid out strange. I agree. We will meet with Mr. B again next week, and he'll offer us some suggestions on how to improve the layout of the bathrooms.

The meeting lasted over 2 hours, but we accomplished so much! Next week, we'll meet with Mr. B to finalize the details, so that the official plans can be worked out.

A very busy day

Three accomplishments yesterday! Visiting the plumber, buying our refrigerator, and selecting possible tiles. Wow!
The plumber was relatively easy. When we first went to the plumber, Joern had really wanted propane for heat and hot water. The plumber gave us a quote which included propane. After some discussion though, we realized that propane may not be the best choice, and we now need a quote for a air pump heating system. We also informed him of the changes to the insulation. So now, he is working on a new estimate, which will be completed at the beginning of next week.
In the afternoon, Joern and I stopped at an electronics store called Media Markt. We had seen our Haier french door refrigerator in this location a few months ago, but it was overpriced compared to some internet sellers. To our surprise, the refrigerator was on sale as a floor sample! Turns out that most German kitchens do not fit these refrigerators, and Germans are down on their electiricy useage. Honestly, they don't use that much electricity compared to what we are paying now in our apartment for electricity! Side-by-sides are growing in popularity here, but are still considered a luxury, and you need a fairly large kitchen for these. I was completely ready to get a side-by-side, having never had one myself, until I started reading that they aren't so great. When I looked at the side-by-side with a less "dream-like" eye, I realized they aren't the best design. But the french door with a bottom freezer seems like a wonderful solution. We knew we would buy this Haier french door, no matter what, and were so excited to find it as a floor sample.

We will be picking it up today! Now, we are finished purchasing all the appliances for our kitchen!

There is a very small hardware store in our town that Joern would like to use in as many ways possible as we build our house. I love that Joern wants to keep it as local as possible. They work with a tile store in Reutlingen, so they recommended we go there to look at tiles. We stopped there last Saturday, but were told to make an appointment. Our appointment was yesterday afternoon. It was another crazy two hours of looking at their relatively small assortment, but we found some really interesting tiles!
What made the process difficult of course were my very American inspirations. A lot of tile here is very efficient, large plates with high-gloss that are easy to clean. But, they are also very modern, and do not fit in my house. I also am not a big tile fan, and in a perfect world, if wood were waterproof and dent-proof, I would have no tile in my home. Alas, the world is slightly imperfect, and we need tile in our bathrooms and in our cellar. Bleh!
We started with the master bath, which turned into a fight, and took about an hour to find something that we both liked. Actually, we fell in love with! I guess I didn't have a strong idea of what I liked. I wanted something natural, but not too natural, beige or grey. The tile had to go with our espresso vanity. Not too easy, I must admit.
After about 45 minutes, we found these, and said, "this is it!"

These tiles are from Villeroy and Boch. Honestly, I was not expecting to use such a high end tile in our bathroom.
Just as our tile designer went to write down the tile name on our form, Joern turned around and saw THE tile. Polished light beige travertine rectangular tiles. Beautiful!
As our designer realized that we were falling for a higher end look, she brought over some mosiac tiles that would go well as the floor in the shower. The ones she brought over, while ridiculously cool, were too much, lots of glass mixed in with stone. I went back to the display of mosaic tile, and found two natural stone mosiacs that were much more me.
Here are the three mosiac choices with the tile:

Here's a close-up of the designer's suggestion:


Yes, it is beautiful, and so very rich looking. But, the glass was just too glitzy for me.
Here is my suggestion, and our final decision:


This is the final decision for the master bath. We will incorporate the mosaic also into the top of the shower, but we're both really happy. I think that with the dark wood, the bathroom will have an extremely rich look.

An hour working on the master bathroom was exhausting. But, we're so excited.

The children's bathroom was pretty quick, because I am planning on wainscoting, so we only need floors. Joern loves wood-look tile, and there was wood in my inspiration picture. But, I chose instead an off-white rectangular tile, that well, almost looks like wood if you really imagine, but is clearly not imitation wood.

We chose a dark grey polished marble-esque tile for the guest bath on the first floor:

I hope it will look good against a white subway tile, and then a dark grey paint on the top half of the walls.



I really loved this blue glass mosaic too. Thinking of how to incorporate this into the house- somewhere.

Oh, and here's the cellar tile. I told Joern he could chose anything he wanted for the cellar. This will be in our entry foyer, bathroom, hobby room, and storage room. Its okay, but since Joern is so happy, I won't complain:

Well, there you have it. We are going to another tile place soon, to have another appointment. I am hoping to find something a little nicer for the children's bath. I am also hoping for a subway tile for the kitchen backsplash.

Wednesday, May 26, 2010

On "Birthday Eve"

Tomorrow will be an exciting birthday for Joern, I'm quite sure. We'll be meeting with the architect and the building engineer on the building lot, to receive our blueprints!!!!!!! This is so exciting!
Other news, Joern contacted the county building office today to ask about the status of our building permit. It was supposed to be finished in the middle of May. He told us that building has been approved, and it will be in the mail on Friday. We will need to go to the Neckartailfingen town hall on Monday- to pick up our building permit!
What an exciting birthday this is turning into for Joern!

Saturday, May 22, 2010

A tiny little ray of light

We will have the blueprints on Thursday. Joern spoke with the architect, who set an appointment to hand over the blueprints to us on Thursday. We will also be meeting with Joern's cousin, the structural engineer, on Thursday as well. According to Mr. Architectle, it takes approximately two weeks to get estimates from builderlds. Really, we could get started soon. BUT, I'm trying not to get my hopes up. At least we will be getting out blueprints.

Thursday, May 20, 2010

Annoyed in Neckartailfingen

The building permit was promised to us by the middle of May. Um, today is May 20th, no longer the middle of the month. We won't buy the land until we get the building permit. It is soooo annoying!
I guess the blueprints are finished. We have to meet with Joern's cousin, the building engineer, and the architect to get the blueprints. I want the meeting yesterday, because we need them to get estimates.
Going slightly crazy here!!
That's all the news for now- bleh!

Sunday, May 16, 2010

Coming together

Two weeks ago, we still only had a few pieces of furniture. Okay, we had a lot, but when I looked at that list of still needs, it was a little overwhelming.
With the purchase of the chair and rug for the living room, our living room is now, for the most part, complete.
Yesterday, I was on Bassett Furniture's website. They had dining room chairs on sale, for a fantastic price. The price brought them in line with the price of Pottery Barn's similar chairs. Joern liked these more because the seat is upholstered, but they were always so darn expensive!
I immediately emailed our designer at Bassett, and asked her to order the chairs for us. She wrote back explaining that there was an error, and that the price was actually $150 per chair more. Yikes. So, I copied the link from the website where it listed the sale price. Surprisingly, and to my disappointment, she replied to my link by saying, "Wow, I think there must be an error. I will email the internet order department, but she won't be in until Monday." Not what I expected at all- I expected her to say that they would honor the price. I was going to place the order then on the internet, with the much better price, but I was annoyed with the company as a whole- because they should have honored the internet price, as there has never been a discrepancy between their internet and store prices, and nowhere does it say on the internet that this sale is internet only. I was mad!
This morning, I woke up and checked my email. There was a mail from my designer, she printed out the page I had linked to her, and gave it to her store manager. He told her that they could honor the price! Wahoo!! AND, the store is picking up sales tax this weekend, so I got the chairs for a really excellent bargain!


I think that the upholstery on the chair is probably pretty basic, but I have already started looking at material, so I can reupholster the chairs.
A huge relief that I finally found dining chairs, and another check off the furniture list!

Friday, May 14, 2010

What a day! New chair and rug for the living room!

I just got off the phone with Crate & Barrel. I called to ask them about the accent chair I want for the living room. I fell in love with the Azure chair from Crate and Barrel last summer when I visited Crate & Barrel in Westport with my fabulous cousin, Elizabeth. Over the past almost year, I decided that the blue would add a little pop of color to the living room, which was turning into a beige nightmare.

It turns out that the chair in blue is considered "Stock Plus," which means it is the same price as their normal stocked chair (it is stocked in taupe,) but must be made to order at the factory. Stock Plus items take 4-6 weeks for production, plus another 1-2 weeks to deliver. So, I decided the best thing to do would be just to order the chair now, to make sure it will be there in time to ship with all our furniture! So, I ordered it!
Since the chair has flat rate shipping, I was told I could add on other items to ship with the chair to stay in the same shipping price. So, I ordered my shag rug!

Oh, and while I was at it, I decided to order a set of mirrors, not sure where they'll go, but I'm sure I'll find a space.

The good news is that since the chair won't be ready to ship till the end of June, I can add other items to the order if I find something, and it will be added in with the flat rate shipping! Horray for very helpful Crate & Barrel!