Here's the same view from today:
Today's status:
Excavation is complete, 6 days ago. The footers have mostly all been filled, with the exception of the trench running along the north side of the house. The drainage pipes that will run underneath the house are laid, and covered by ballast stones. Today, the water connection was attached, and now is that black pipe with the blue pipe sticking out of it. The electricty was also brought up to the house, and comes out of a pipe next to those wood boards. The waste water pipes have also been laid, and too are mostly covered by ballast stones. The majority of the building lot is now covered with a material that acts as a barrier to help keep the ballast stones in place. This is the white material you can see in the above picture. Digging began today for the underground cistern that will be under the driveway.
Over the course of this week, the building site has gone from a big hole in the ground to a very clear and definite building site!
No comments:
Post a Comment