Monday, November 8, 2010

Just go away for a week, the progress is amazing!

While we were here:


Seeing this:

And drinking this:


This is what the builders did:
The pre-fab portion of the ceiling of the cellar was installed, the first pipes for the air filtration unit (in orange,) were laid, our first temporary stairs were installed, and preparation for the poured concrete floor were completed.

The trench around the house was completely filled in.

Our light wells were installed, the add-on was placed above the completed concrete box for our gas tanks.


We are absolutely shocked that so much happened last week, both in Ireland and in Neckartailfingen.  It is huge!  We're looking forward towhat this week will bring!