Despite all this, I am happy to see that there is progress being made. It is very nice to know that the rough plumbing is all done now, including our last minute addition of our central vaccuum. And despite the very drawn out procedure, the electrical is getting there.
We didn't visit the house very much during the week, and when we did, I didn't have the camera with me, and I was too tired to really focus enough to realize that I needed to take pictures. But, I found my energy by Friday, and I was so excited to get back on track.
It would be nice to split up plumbing and electrical, but that wouldn't really be possible without a lot of cropping. Honestly, I'm not up for that much work right now.
Here is what our house looked like after another week's worth of work:
First floor
Kitchen. Outlet boxes have been installed. Straight ahead will be the outlets for the built-in oven and the refrigerator.
Kitchen sink area. Outlet boxes for both 220 and 110 Volt.
Water pipes for pot filler and possible water connection for fridge. Electricity for oven and
range hood.
A proud homeowner and his kitchen.
Electrical running to the fireplace.
Water pipes running from the fireplace. Electrical running the length of the living room and dining room.
Wires running through the walls in the guest bedroom.
Looking into the guest bedroom. Orange and black tubes are for electrical and computer network cables.
There are ELEVEN switches and outlets here. This is the control for our exterior shutters.
On the wall to the right of where all the tubes enter the wall, there is a rectangular cut-out, this is for the central vac.
Second Floor
Children's bath, hookup for washer and dryer, and water for shower.
Water pipes and electrical.
Connection for sink and farther back, for the second "1920's" toilet.
Probably the job of the elctricians, the floor underneath the waterpipes was chisled out
at intersections of water and electrical.
Master shower. Controls and water connections for massage shower heads.
Water hookup for bathtub.
The master bath plumbing and electrical, completely roughed out.
Attic
Vent for the children's bath.
Vent for powder room and maybe water in kitchen.
Cellar
Looking down the stairs. Boxes installed for LEDs along stairway. Water pipes running out to garage.
Another view of water pipes from mechanical room to Joern's garage.
Water pipes in Joern's garage. One tap in the far corner, behind our already present mess.
Another tap installed in the front corner. Why do I see Joern's garage becoming
a man-paradise?
OMG, cables, cables, cables, waiting for the circuit box.
The ever growing pile of drilled out hole debris.
Hopefully, next week will see the completion of the electrical, so that the plaster guys can get started. Maybe it isn't such a bad thing because we shouldn't have the pipes installed for the radiant heating before our upcoming Richtfest, on June 11th. We'll see what next week holds in store for us and the house!